Land plot area
3.8114
Relief
Plain
Ownership
Municipal
District
Bila Tserkva
Locality
Bila Tserkva
Address
Hryboiedova St.
Designation purpose
For the construction and maintenance of residential buildings, outbuildings and structures (homestead)
General description
The lease payment for the land is negotiable
Cadastral number:3210300000:07:009:0101
Power supply, water supply, sewerage, gas supply are available
A road with two-way traffic and asphalt pavement of 18 m in width is nearby
The distance to the state highway Р-32, М-05, Е-95 is 8 km
The nearest E-95 motorway is 8 km away
Shuttle and bus transport, trolleybus run near the plotThere is a bus stop "10 shkola"
The distance to the railway station "Bila Tserkva" is 3.9 km
The distance to the Zhulyany International Airport is 83 km
The land plot is formed for the sale of the lease right by holding a land auctionThis territory has a detailed plan, which was approved by decision of Bila Tserkva City Council No. 116-08-VІІ "On approval of detailed plans of the territories of the city of Bila Tserkva" as of March 24, 2016Transport and engineering infrastructure run along with the land plot.
[email protected], [email protected]
Cadastral number:3210300000:07:009:0101
Power supply, water supply, sewerage, gas supply are available
A road with two-way traffic and asphalt pavement of 18 m in width is nearby
The distance to the state highway Р-32, М-05, Е-95 is 8 km
The nearest E-95 motorway is 8 km away
Shuttle and bus transport, trolleybus run near the plotThere is a bus stop "10 shkola"
The distance to the railway station "Bila Tserkva" is 3.9 km
The distance to the Zhulyany International Airport is 83 km
The land plot is formed for the sale of the lease right by holding a land auctionThis territory has a detailed plan, which was approved by decision of Bila Tserkva City Council No. 116-08-VІІ "On approval of detailed plans of the territories of the city of Bila Tserkva" as of March 24, 2016Transport and engineering infrastructure run along with the land plot.
[email protected], [email protected]
Selling price
0
Lease price
0
Building size (if any)
Availability of utilities (distance to the connection point, m)
Power supply
Water supply
40
Drainage
40
Gas supply
40
Distance to transport links, km
Road
Highway
8
Motorway
8
Bus service
0
Railway service
3.9
Air service
83
Contacts
Contact person
Olesia Vasylivna Borzak
Phone
380456353108
E-mail