Land plot area
0.7
Relief
Ownership
Private
District
Boryspil
Locality
Pereiaslav
Address
-
Designation purpose
General description
The 0.7-hectare site involves production facilities with an area of 2,702 sq m and warehouses.
The price is negotiable.
The distance to the motorway is 1 km.
The distance to the railway track is 27 km.
There is an asphalt access road for trucks with a width of 6 m.
Public transport runs near the site.
Parking for cars is available.
The facilities were built in 1961.
The class of the building is 1.
The length of the building is 170 m, 100 m, 22 m.
The width of the building is 10 m, 9 m, 9 m.
The height of the building is 6 m, 8 m.
Power supply is available.There is its own 200 kW transformer substation and a standby 200 kW transformer substation.
Gas supply is available.
There is its own well and a water tower with a capacity of 100 cu m/day.
Drainage is available; discharge capacity is 100 cu m/day.
Waste treatment facilities are available.
The facilities are heated from a block-type gas boiler house with two steam boilers.
The facilities are heated.
Ventilation and air conditioning are available.
There is a fire extinguishing system, smoke detectors, emergency and evacuation lighting.
There is a telephone connection and Internet.
Contact person:
Mykola Fedorovych Korotenko, Deputy Chairman of the Board of Regional Union Of Consumer Cooperation
phone: +38 044 528 60 66, +38 044 528 53 77
The price is negotiable.
The distance to the motorway is 1 km.
The distance to the railway track is 27 km.
There is an asphalt access road for trucks with a width of 6 m.
Public transport runs near the site.
Parking for cars is available.
The facilities were built in 1961.
The class of the building is 1.
The length of the building is 170 m, 100 m, 22 m.
The width of the building is 10 m, 9 m, 9 m.
The height of the building is 6 m, 8 m.
Power supply is available.There is its own 200 kW transformer substation and a standby 200 kW transformer substation.
Gas supply is available.
There is its own well and a water tower with a capacity of 100 cu m/day.
Drainage is available; discharge capacity is 100 cu m/day.
Waste treatment facilities are available.
The facilities are heated from a block-type gas boiler house with two steam boilers.
The facilities are heated.
Ventilation and air conditioning are available.
There is a fire extinguishing system, smoke detectors, emergency and evacuation lighting.
There is a telephone connection and Internet.
Contact person:
Mykola Fedorovych Korotenko, Deputy Chairman of the Board of Regional Union Of Consumer Cooperation
phone: +38 044 528 60 66, +38 044 528 53 77
Selling price
0
Lease price
0
Building size (if any)
2 702 m2
Availability of utilities (distance to the connection point, m)
Power supply
0
Water supply
0
Drainage
0
Gas supply
0
Distance to transport links, km
Road
0
Highway
0
Motorway
1
Bus service
Railway service
27
Air service
Contacts
Contact person
Mykola Fedorovych Korotenko
Phone
38 044 528 60 66
E-mail